Florida Condo Milestone Inspections and SIRS, Explained

November 21, 2025

Are you hearing about Florida condo milestone inspections and SIRS and wondering how they affect your purchase or sale in Madeira Beach? You are not alone. These rules aim to keep buildings safe, but they also shape budgets, timelines, and even loan approvals. In this guide, you will learn what inspections cover, how SIRS influences reserves and assessments, and what to review before you buy or list. Let’s dive in.

What milestone inspections are

Milestone inspections are periodic engineering assessments that look for structural deterioration and life-safety concerns in many Florida condominium buildings. They were created after Surfside to catch problems early and help associations plan repairs. The inspections are typically performed by licensed structural or civil engineers.

The goal is straightforward. Identify structural risks, recommend fixes, and document a plan so boards can act and protect residents. For coastal Madeira Beach buildings, these checks are especially important because salt air accelerates corrosion.

What engineers look at

  • Load-bearing elements like columns, beams, and shear walls
  • Balconies and balcony connections
  • Parking garages and structural slabs
  • Exterior walls, cladding, and waterproofing
  • Roof systems and drainage
  • Foundations and signs of settlement
  • Corrosion of reinforcing steel
  • Elevator shafts, stairwells, and relevant life-safety systems

Engineers perform visual assessments and may do selective invasive testing when needed. That can include core samples, sounding, or corrosion testing to confirm what is happening behind finishes.

What SIRS means for you

A Structural Integrity Reserve Study, or SIRS, is an engineering-driven reserve study focused on major structural components. Think roof replacement, concrete restoration, balcony remediation, exterior envelope work, and garage deck repairs.

Unlike a standard reserve study that centers on accounting formulas, SIRS goes deeper on engineering and project planning. It estimates remaining useful life, outlines repair options, provides cost ranges, and recommends reserve targets tied to actual structural needs.

What you get from a SIRS

  • A prioritized list of structural projects
  • Estimated timelines and remaining useful life
  • Cost ranges and repair methods
  • Recommended reserve funding levels to match those needs

When a SIRS uncovers a gap between current reserves and recommended funding, boards may need to update budgets, plan phased work, or pursue financing.

Why Madeira Beach condos are in focus

Madeira Beach sits on the Gulf, which means salt air and moisture can shorten the life of exterior concrete, metal fasteners, balcony connections, and reinforcing steel. Older buildings, properties three or more stories tall, and buildings with exposed concrete or parking decks are more likely to need attention.

Inspection outcomes can lead to simple maintenance or to large-scale projects. Transparency and a funded plan help marketability. Uncertainty can slow a sale or reduce buyer interest.

From inspection to repairs to funding

  • Inspection and report issued
  • Engineer categorizes urgent items versus medium or long-term work
  • Board votes on scope, budgets, and contractor selection
  • Funding plan set through reserves, special assessments, association loans, or increased dues

Safety-critical work can move quickly, often within months. Larger envelope or structural projects can take 6 to 24 months or more because they require design, permitting, bidding, and construction.

Budget impacts and assessments

SIRS can reveal a funding shortfall. If reserves are low relative to recommended structural work, boards typically consider one or more of the following:

  • Special assessments
  • Annual budget increases
  • Association loans

The size of any special assessment depends on project scope and the number of units in the building. Large concrete, garage, or envelope projects can reach into the millions for mid to large buildings. That reality affects owners’ monthly budgets and buyers’ debt-to-income ratios.

Buyer and seller considerations in Pinellas County

Lending and saleability

Lenders often review project health. Recent major structural findings, unresolved safety citations, or big unfunded special assessments can trigger stricter underwriting. Some loan programs may be off the table until repairs are complete or fully funded. Clear documentation and a credible plan help keep deals on track.

Public disclosures also matter. If there is a recent structural report or a pending assessment, you should expect buyers to ask detailed questions and to factor those items into their offers.

Insurance and permitting realities

Insurance premiums for coastal buildings can be higher. Large repair projects require qualified contractors and permits, and both contractor capacity and permitting timelines can stretch schedules. Plan for realistic timeframes with the City of Madeira Beach and Pinellas County permitting processes.

Red flags to watch

  • A recent milestone inspection that lists multiple imminent safety items without a funded repair plan
  • A SIRS that shows a significant reserve shortfall
  • No bids or approved remediation plan for urgent items
  • Recorded liens, pending special assessment votes, or code enforcement actions that are not clearly disclosed
  • Insurance gaps or high deductibles that could expose owners to out-of-pocket costs

What to request and verify

Ask for the actual documents, not summaries. Verification protects you during negotiations and financing.

Document checklist

  • Most recent milestone inspection report and any follow-up engineering reports
  • Structural Integrity Reserve Study or the most recent reserve study with spreadsheets
  • Association board minutes covering inspections, repair planning, and votes for at least the last 12 to 24 months
  • Current operating budget and latest financial statement, including reserve balances and line-item allocations
  • Bids, contracts, scopes of work, and any loan or grant documents
  • Association insurance declarations and any open claims or litigation notices
  • Building age, certificate of occupancy date, and records of major past structural or envelope repairs
  • Permit history and any code enforcement notices
  • Any recorded liens or official notices tied to building safety

Questions to ask the association or listing agent

  • When was the milestone inspection performed, and by which licensed engineer?
  • Which items were labeled immediate or safety concerns, and what are the written recommendations and estimates?
  • Has the board approved a repair scope, budget, and payment plan? What are the timelines?
  • What is the current reserve balance, and how much is allocated to structural items?
  • Are special assessments or dues increases expected?
  • Are there any recorded notices, enforcement actions, or litigation related to structural issues?
  • Will the association allow buyers to review the full inspection report and SIRS within the statutory condo document review period?

Local offices and records to check

Use official sources to confirm building history and filing requirements:

  • Florida Condominium Act, Chapter 718, for current inspection thresholds and timelines
  • Florida Department of Business and Professional Regulation and the Florida Board of Professional Engineers for rules and professional standards
  • City of Madeira Beach Building Department for certificate of occupancy and permits
  • Pinellas County Building Department for historic permits and inspections
  • Pinellas County property records and clerk’s office for recorded notices or liens

If you need interpretation of an engineer’s report, consult a licensed structural engineer. For legal questions, speak with a condominium attorney. For association budgeting and reserves, a CPA or association specialist can help you understand the financial implications.

Smart steps for Madeira Beach buyers

  • Ask for the full milestone report, SIRS, board minutes, and current budget early in your process.
  • Review reserve balances and any planned assessments against your monthly and total cost expectations.
  • Confirm whether urgent repairs are funded and scheduled.
  • Discuss lender requirements in advance so you know what project documents your lender will ask for.
  • If needed, have an engineer review the documents and explain the findings in plain terms.

Smart steps for Madeira Beach sellers

  • Gather the milestone report, SIRS, recent minutes, and current budget before you list.
  • Clarify what is funded, what is planned, and the expected timeline.
  • Be ready to explain special assessments, payment schedules, and any borrowing the association has approved.
  • Price and position your condo with transparency. A clear, credible plan supports buyer confidence and can shorten time on market.

Work with a local team you can trust

You do not have to navigate inspections, reserves, and disclosures alone. A knowledgeable local team can help you obtain the right documents, interpret market impact, and coordinate timing with lenders and association managers. If you are considering a Madeira Beach sale or purchase, we are ready to help you move forward with clarity and confidence.

Ready to talk through your options? Contact the Manly Buns Group to Schedule a Free Consultation.

FAQs

What is a Florida condo milestone inspection?

  • It is a periodic engineering assessment of a condominium’s structural components designed to identify deterioration and safety issues so associations can plan repairs.

What is a SIRS and how is it different from a reserve study?

  • A SIRS focuses on structural elements with engineering-based timing and cost ranges, while a standard reserve study is broader and more accounting driven.

How can inspections affect condo fees and assessments?

  • If a SIRS shows a funding gap for upcoming structural work, boards may increase dues, levy special assessments, or obtain loans to cover costs.

What should a Madeira Beach buyer ask for before making an offer?

  • Request the milestone report, SIRS, recent board minutes, current budget, reserve balances, and details on any planned or pending special assessments.

Do coastal conditions change timelines for repairs?

  • Salt air and marine exposure can accelerate corrosion, which can lead to earlier or more frequent remediation projects and longer planning and permitting timelines.

Experience the Difference

At Manly & Buns Group, we believe that every client deserves an exceptional real estate experience. We go above and beyond to ensure that your real estate journey is not only successful but also enjoyable and stress-free. Discover the difference of working with a team that truly cares about your needs and goals.